Business Performance Electric Work Transmission Line ( overhead )
Transmission Line ( overhead )

No

Name of project

Client

Year completed and
Type of work performed

(1000kw)

(1USD)

1

154kV Eomda Interconnection
T/L Construction

KEPCO
Gwangju
Branch(T/L)

95.01.03~95.12.29
154kV T/L

1,648,219

1,789,597

2

Re-enforcement for 154kV
Yeochun T/L Construction

KEPCO
Gwangju
Branch(T/L)

96.07.18~96.12.30
154kV T/L

576,655

626,118

3

154kV Eomda Interconnection
T/L Construction

KEPCO
Gwangju
Branch(T/L)

96.11.25~
154kV T/L

37,400

40,608

4

345kV west Daegu T/L
GW Change Construction

KEPCO
Shinokcheon
Branch(T/L)

97.05.25~97.10.01
345kV T/L

402,299

436,807

5

Change of the conductor 154kV T/L NamGwangju tower no49to50

KEPCO
Gwangju
Branch(T/L)

99.06.09~99.07.09
154kV T/L

84,799

92,073

6

Re-enforcement for O/H GW Line
ShinGangjin S/S

KEPCO
Gwangju
Branch(T/L)

99.10.04~99.11.02
T/L GW

27,277

29,617

7

154kV Eomda Interconnection
T/L Construction

KEPCO
Gwangju
Branch(T/L)

99.11.08~99.12.27
154kV T/L

44,595

48,420

8

Re-enforcement for Foundation
154kV Dongducheon T/L

KEPCO
Euijeongbu
Branch(T/L)

99.07.21~99.11.17
154kV T/L

356,327

386,891

9

Re-enforcement for Foundation
154kV Yeongwol T/L

KEPCO
Donghae
Branch(T/L)

00.05.04~00.10.30
154 kV T/L

517,332

561,707

10

Safety Clearance for 345kV
Shin Namwon T/L

KEPCO
Daejeon
Branch(T/L)

00.07.18~00.11.14
345kV T/L

1,005,706

1,091,972

11

Maintenance of T/L and
Insulator Washing
(2001 contract)

KEPCO
Gwangju
Branch(T/L)

01. 01.03~ 01.12. 31
Maintenance T/L

1,087,639

1,180,933

12

154kV T/L Interconnection
Project Uiljeon

KEPCO
Suwon
Branch(T/L)

99. 12.30 ~ 01. 11.05
154kV T/L

774,668

841,116

13

Maintenance of T/L and
Insulator Washing
(2002 contract)

KEPCO
Gwangju
Branch(T/L)

02. 01.03~ 02.12. 31
Maintenance T/L

988,811

1,073,628

14

Re-location works for Tower
No140 to150 in ShinGwangju
345kV T/L

KEPCO
Gwangju
Branch(T/L)

02 .02. 22 ~ 02.12.23
345kV T/L

855,162

928,515

15

154kV T/L Project between
Munmak and Wonju

KEPCO
Jecheon
Branch(T/L)

00 .12. 01 ~ 03.10.31
154kV T/L

5,798,521

6,295,897

16

Space damper works
345kV Shinhwasoon T/L

KEPCO
Gwangju
Branch(T/L)

03 .06. 18 ~ 03.09.23
345kV T/L

98,696

107,162

17

Maintenance of T/L and
Insulator Washing
(2003 contract)

KEPCO
Gwangju
Branch(T/L)

03. 01.03~ 03.12. 31
Maintenance T/L

1,076,417

1,168,748

18

Re-location works for 154kV T/L
in Pohang Ind-Area

KEPCO
Daegu
Branch(T/L)

04 .06. 09 ~
154kV T/L

1,407,208

1,527,913

19

345kV T/L Project between
Yangyang and Donghae

KEPCO
Jecheon
Branch(T/L)

03 .12. 16 ~ 06.09.17
345kV T/L

6,832,374

7,418,430

20

765kV T/L Project between
Shinansung and Shingapyeong(3)

KEPCO
T/L Loop
Construction
Dept

05 .09. 05 ~ 10.06.30
765kV T/L

8,709,272

7,917,520

21

154kV T/L Interconnection
Project Cheongbuk

KEPCO
Suwon
Branch(T/L)

06 .05. 06 ~ 07.11.11
154kV T/L

3,634,483

3,946,236

22

345kV T/L Shinansung T/L
Interconnection Project

KEPCO
Suwon
Branch(T/L)

06.11. 17 ~ 08.08.17
345kV T/L

6,737,537

7,315,458

23

154kV T/L Daegu-Bongdeok
Construction

KEPCO
Daegu
Branch(T/L)

07 .12. 26 ~ 09. 12.16
154kV T/L

8,063,157

8,754,785

24

Re-enforcement works for
345kV Cheongwon T/L
Insulators( 3site)

KEPCO
Shinokcheon
Branch(T/L)

07 .03 .23 ~ 07.07.26
345kV T/L

1,479,055

1,605,923

25

Maintenance of T/L and
Insulator Washing
(2007 Year contract)

KEPCO
Gwangju
Branch(T/L)

06.02. 23 ~ 07. 02.28
154kV T/L

1,178,112

1,279,166

26

Meghnaghat - Aminbazar
400kV Double Circut Transmission
Line of Turnkey Basis

PGCB

10.07.08 ~ 13.06.30

44,931,466

39,762,360

27

345kV T/L Shinga pyeong
- Shin pocheon Construction

KEPCO
Kukdong(T/L)

09.07. 31 ~ 13.05.03
345kV T/L

6,795,800

6,178,000

28

345kV T/L Construction for MPC
Yulchon Generation

MPC

12.03. 16 ~ 13. 08.28
345kV T/L

13,707,100

12,461,000

29

765kV T/L Shingori - Bukgeongnam
Construction

KEPCO
Samsungcnt(T/L)

09.04. 15 ~ (14. 12. 13)
765kV T/L

11,440,242

10,400,220